Portfolio

January 2024, Jamie Gant 

Bentley Going Digital Award: Bridges & Tunnels

Architecture, Engineering, Constructions, & Operations

In this project, I developed developed an AR bridge experience that was coupled with a 3D-printed bridge for the Rappahannock Bridge construction project.

I created this for JMT, a leading AECO firm. The 3D printed bridge model displays the key construction aspects of the bridge while the AR experience, through the use of an iPad, allows the viewer to interact with content as it pertains to specific areas of the bridge, see a simulation of traffic on the bridge, and view videos and other public outreach content about the project.

The AR experience won the Bentley Award in October 2024.

JMT

Based on a bridge that JMT designed, CAD files were used to create a physical 3D model to represent the bridge. Using a smart device and the power of augmented reality (AR), JMT Technology Group developed a prototype AR experience that is triggered by pointing a mobile device at a 3D-printed model of the bridge structure. Users can view and inspect the bridge infrastructure, design plans, videos, traffic simulations, and construction documents.

The detailed model data created as part of the design/build plans and stored in Bentley or Autodesk platforms is leveraged to create the 3D assets imported into gaming platforms and utilized to create the 3D printed models. This extends the usage of the client deliverables and project artifacts to be utilized for collaboration and public engagement.

.

More Videos